
The team working on the removal of the capsized car carrier Golden Ray is preparing for the final stage of the operation to remove the vessel that has been lying on its side in St. Simons Sound since September 2019.
The twin-hull heavy lift vessel VB-10,000 arrived at the Port of Fernandina in Florida on July 3 for final modifications and function checks before heading to St. Simons Sound. The lift vessel is currently scheduled to arrive at the wreck site by mid-July.
The 255-foot tall gantries of the VB-10,000 made an impressive sight at the docks in Florida. The configuration of the rigging beams underneath the top of the gantries will be modified to prepare for the lifting on the Golden Ray.
Continue reading “Golden Ray: Heavy crane set to lift and salvage capsized vessel”